πŸ“‹ Case Study

Wastewater Reclamation for Semiconductor Fab Using RO-NF Hybrid

High silica, boron, and trace metals (Cu, Ni) exceeding ultrapure water (UPW) specs (<0.1 ppb metals)

πŸ—οΈ Project Overview

300mm wafer fab in Arizona targeting 85% water reuse amid drought restrictions

🎯 Challenge

High silica, boron, and trace metals (Cu, Ni) exceeding ultrapure water (UPW) specs (<0.1 ppb metals)

πŸ”§ Design Approach

Two-pass RO (first pass: BWRO, second pass: SWRO with pH adjustment), followed by NF polishing and electrodeionization (EDI); real-time ICP-MS feed monitoring

πŸ“ Design Diagram

RO-NF Hybrid UPW ReclamationBWRO1st PassSWRO2nd Pass
pH↑NFPolishingEDIFinal PolishingICP-MSReal-time feed monitoringChallengesSiOβ‚‚, B, Cu, NiLSI = βˆ’0.8B rejection = 92.3%

AI-generated project design illustration

πŸ“ Key Calculations

Langelier Saturation Index (LSI)

pH βˆ’ pHs
Result: βˆ’0.8
Predicts scaling propensity

Boron Rejection (RO)

1 βˆ’ (C_perm/C_feed)
Result: 92.3%
Dictates need for NF polishing

πŸ“Š Results

91.4% reuse rate achieved; UPW resistivity >18.2 MΩ·cm; annual water cost savings: $2.7M

πŸ’‘ Lessons Learned

  • β€’NF stage required for boron polishingβ€”RO alone insufficient
  • β€’Silica scaling mitigated via antiscalant dosing + automatic CIP scheduling

βœ… Key Takeaways

  • 1NF stage required for boron polishingβ€”RO alone insufficient
  • 2Silica scaling mitigated via antiscalant dosing + automatic CIP scheduling