Nitric Acid Storage Tank MOC Failure Root Cause Analysis at Fertilizer Facility
Post-MOC leak occurred due to incompatible gasket material (EPDM vs. concentrated HNO₃)
🏗️ Project Overview
Upgraded secondary containment for 500,000-gallon nitric acid tank
🎯 Challenge
Post-MOC leak occurred due to incompatible gasket material (EPDM vs. concentrated HNO₃)
🔧 Design Approach
Bow-tie analysis identifying failure path; revision of MOC checklist to include chemical compatibility matrix and vendor data verification step
📐 Design Diagram
AI-generated project design illustration
📐 Key Calculations
Compatibility Index Rating
CIR = Σ(material resistance scores)
Result: EPDM = 1.2 (Fail); Viton® = 4.8 (Pass)
Objective threshold for material approval
📊 Results
Zero repeat incidents in 36 months; MOC checklist adopted corporate-wide; integrated NACE MR0103 database into engineering workflow💡 Lessons Learned
- •MOC must verify *all* materials—not just primary vessel
- •Vendor datasheets require independent lab validation for aggressive services